

ITALPRESSE - XL/6 30-13 PM BOIT-VEN-ITA-2025-00001
Do you have further questions? Contact us.

Sergi Guardia
+49 162 4027635
s.guardia@gindumac.com
- GINDUMAC
- Products
- Wood Working
- ➤ Used ITALPRESSE XL/6 30-13 PM BO For Sale | gindumac.com
This ITALPRESSE XL/6 30-13 PM BO veneer press was manufactured in 2025. Consider the opportunity to buy this ITALPRESSE XL/6 30-13 PM BO veneer press. Contact us for more information.
Overview
- brand: ITALPRESSE
- year: 2025
- MODEL: XL/6 30-13 PM BO
- application type: Pressing / Laminating
- Location: Italy
- machine type: Veneer Press
Technical Information - ITALPRESSE XL/6 30-13 PM BO
Technical Specification
- Pressing Force: 1200 Kn
Additional Information
Additional equipment
- Mylar Foil Attached to Upper and Lower Press Plates
- Electronic Flatness Control (EFC) for Incorrect Loading Protection
Machine Benefits
Technical Machine Benefits
- Dimensions of heating plates: 3000 x 1300 mm
- Number of heating plates: 2 pcs
- Number of levels: 1
- Level opening: 370 mm
- Max temperature of heating medium: 120°c
- Working temperature: 70-90°c
- Installed electrical heating power: 18 kw
- Operating voltage: 400 v- 50hz- 3 ph
Extra Information
Features: Touch Screen SIEMENS 4.3 Inch TFT Digital Press Timer Digital Temperature Controller Digital Working Pressure Controller Day/Week Timer for Heating Switch-On Time Automatic Hydraulic Pressure Calculation Error Display and PLC Control Save and Recall up to 200 Work Programs Pre-Press Pressure and Time Settings Safety Devices: Two-Hand Release with Safety Circuit Safety Rip Cord around the Machine Safety Support for Lower Press Table Protective Plate for Rack/Gear Safety Instructions Sticker CE Standard Compliance CE Declaration of Conformity Special Processing of Solid Steel Heating Plate Surface Switching Off Left Cylinder Row
*There may be differences between the data shown and the actual values, this should be confirmed by the sales representative.
** The default scope of delivery includes the machine only. Accessories and peripheral equipment will be confirmed through binding agreements during the purchasing process.
Sergi Guardia
Payment Terms
Payment in advance
Asset Financing